Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

May 04, 2020     Instrument panel; starter switch wiring bus. - (4.4 hours)       Category: Avionics
1. Printed out full-size prints of the instrument panel and Circuit Breaker panel, and attached them to the actual panels in the airplane. Worked out some more slight changes to the location and labeling of a few switches with my panel design guru, Joe. We are now to the stage where we're moving items 1/4" or less, so I think we're pretty close to finalizing everything.

2. Located, drilled and installed the terminal strip that will interconnect the stick-mounted starter switch, the backup starter switch, and the starter relay. This terminal block is located under the front seat, close to where the stick wires come through the spar.


 